Evapotron – Spiritual Playa https://spiritualplaya.org Christian Science Camp at Burning Man - "Life, Truth, Love: The Christian Science Experience" - aka "Healing Foot Wash Life Truth Love" Fri, 16 Aug 2013 19:38:57 +0000 en-US hourly 1 https://wordpress.org/?v=6.9 45373213 Evapotron progress! https://spiritualplaya.org/2013/08/07/evapotron-progress/ https://spiritualplaya.org/2013/08/07/evapotron-progress/#respond Wed, 07 Aug 2013 19:13:53 +0000 http://spiritualplaya.org/?p=249 Continue reading Evapotron progress! ]]> Our initial attempts to cut the metal lath material we’re using for increasing surface area on our evapotron were not pretty — dull tin snips were not the right tool for that job.  Thankfully we were able to consult with Gabriel’s brother-in-law Mike, who runs a pre-fabrication shop in San Francisco, and he knew exactly what would be best to cut the material.  He also offered to make the cuts, which was a definite blessing.

Mike in the prefab shop
Mike in the prefab shop
Mike in the prefab shop
Mike in the prefab shop
Cutting the metal lath
Cutting the metal lath
Cutting the metal lath
Cutting the metal lath
Cutting the metal lath
Cutting the metal lath
Cutting the metal lath
Cutting the metal lath
Cutting the metal lath
Cutting the metal lath
]]>
https://spiritualplaya.org/2013/08/07/evapotron-progress/feed/ 0 249
Making progress with our Burning Man camp preparations: Tower of Shower and Evapotron! https://spiritualplaya.org/2013/08/06/making-progress-with-our-burning-man-camp-preparations-tower-of-shower-and-evapotron/ https://spiritualplaya.org/2013/08/06/making-progress-with-our-burning-man-camp-preparations-tower-of-shower-and-evapotron/#respond Tue, 06 Aug 2013 16:11:38 +0000 http://spiritualplaya.org/?p=218 Continue reading Making progress with our Burning Man camp preparations: Tower of Shower and Evapotron! ]]> Last night Julian, Grant, Gabriel and Amanda met at the Berkeley CSO to get some good work done on our camp preparations.  We worked on our shower structure (aka the “Tower of Shower”)  and an evapotron of our own design (to help evaporate used water at the camp).  We also got our 30′ dome actually ordered so it should be on its way soon!  It was a lot of fun and we’re really looking forward to the next 2 weeks of preparation before we drive out to the playa.  As always, we welcome your thoughts, prayers and good intentions!

Working on the frame for the shower
Working on the frame for the shower
Working on the frame for the shower
Working on the frame for the shower
Working on the frame for the shower
Working on the frame for the shower
Working on the frame for the shower
Working on the frame for the shower
First bit of the frame for the evapotron is complete!
First bit of the frame for the evapotron is complete!
Testing the load-capacity of the shower frame
Testing the load-capacity of the shower frame with a 3lb hammer.
Testing the load-capacity of the shower frame
Testing the load-capacity of the shower frame
Testing the load-capacity of the shower frame
Testing the load-capacity of the shower frame
Working on the frame for the evapotron
Working on the frame for the evapotron
Working on the frame for the evapotron
Working on the frame for the evapotron
Working on the frame for the evapotron
Working on the frame for the evapotron
]]>
https://spiritualplaya.org/2013/08/06/making-progress-with-our-burning-man-camp-preparations-tower-of-shower-and-evapotron/feed/ 0 218